Marillana Iron Ore Feasibility | Ausenco
The PFS was based on the mining and beneficiation of detritals and CID ore at a design plant throughput of 37.5 Mt/y, with a mine life in excess of 20 years at a nominal 18 Mt/y production. The PFS envisaged that both detritals and CID will be processed as a fines only (-8 mm) product, with the CID material being processed on a campaign basis.
Read More